mahan sanat
mahan sanat
  • About
    • History
    • Representations obtained
    • Strategy
  • Projects
    • Surface Projects
    • Underground Projects
    • Operational Bases
    • Projects on Map
  • Certificates
    • Company Certificates
  • Communication
    • Contact us
    • Company News
منوی اصلی

  • History
  • Representations obtained
  • Strategy

  • Surface Projects
  • Underground Projects
  • Operational Bases
  • Projects on Map

  • Company Certificates

  • Contact us
  • Company News
  • Login
  • Sign up

   
English Persian
Current Surface Projects
adding two turbo compressors in the gas and liquefied gas factory 700 and 800
1402/02/05
Completion of Gore crude oil storage tanks by EPC method, strategic tanks construction plan Crude oil
1401/11/01
Tamin Package B on-off Valves 18 to 34 inch valves
1401/05/05
Full implementation of landscaping and construction of sandy car parking of Foley barracks Abad Ahvaz
1401/07/16
replacement of gas pipeline network with Maron as additional EPC activities
05/25/99

 
Finished Surface Projects
Purchasing and replacing a number of gas and liquefied gas plant valves 1000
93/4/10
Construction of 12 inch Rosminy pipeline in the new corridor of Mahshahr Bakhshi city From the project 081308
07/10/95
Provision of goods and installation of well facilities and construction of flow pipeline of the well) E127N Tabnak
10/1/92
Provision of goods and installation of well facilities and construction of flow pipeline of wells) E113S Kangan along with the supply of goods for well facilities and flow pipelines for three other wells
90/6/26
buy 12 flow pipes for 10 oil and gas wells ( Shirin Service)
98/06/09
Construction of site and access road to the well, location E039N Meydan Dalan
06/01/99
Construction of access road and location of E053S Meydan Nazgiran
07/05/99
Purchasing and installing valves and fittings on the light gas route of the factory outlet Gas and liquefied gas 1600
01/26/97
Provision of goods and installation of well facilities and construction of flow pipeline for 52 wells and 53 Najjiran
87/5/6
Provision of goods and installation of well facilities and construction of flow pipeline for well no. 8 Shanol
85/7/20
Preparation and installation of well facilities for wells D1,D2 of the householders
87/2/22
Preparation and installation of guardrail fences
87/25/87
Construction of alternative facilities due to Upper Dam/collection of well facilities and pipelines Submergence of alternative pipelines
88/9/21
Provision of goods and installation of well facilities and construction of flow pipeline for 11 wells and 12 Shanol
89/4/7
purchase of single-walled polyethylene pipe with a diameter of 70 mm PN6 and purchase of single-walled polyethylene pipe with a diameter of 450 mm - pn6
1398
purchase of single-wall polyethylene pipe with a diameter of 70 mm PN6
1398

 
Home  |  About Us  |  Contact Us  |  Sitemap

All rights of this site belong to Mahan Sanat Arya®