mahan sanat
mahan sanat
  • About
    • History
    • Representations obtained
    • Strategy
  • Projects
    • Surface Projects
    • Underground Projects
    • Operational Bases
    • Projects on Map
  • Certificates
    • Company Certificates
  • Communication
    • Contact us
    • Company News
منوی اصلی

  • History
  • Representations obtained
  • Strategy

  • Surface Projects
  • Underground Projects
  • Operational Bases
  • Projects on Map

  • Company Certificates

  • Contact us
  • Company News
  • Login
  • Sign up

   
English Persian
 
 
Return to list 
Current Surface Projects

adding two turbo compressors in the gas and liquefied gas factory 700 and 800

including doing all detailed design and engineering work (Section (E) purchase and supply, loading, transportation, unloading and delivery of all equipment and goods, materials and special supplies needed, including spare parts for pre-commissioning courses and start-up and two-year operation period from inside or outside the country in the form of DDP based on 2020 Incoterms, including the cost of unloading at the location mentioned below by the contractor) (section (P) performing the construction of the necessary equipment at the site of the workshop, equipping and dismantling the workshop HSE works, construction and installation, pre-commissioning, commissioning, functional testing, training, temporary delivery, definitive delivery guarantee period and other services (Part C) as described in the provisions of the contract as EPC for the project of adding two turbocompressors to the existing turbocompressors.

  Contract Type: EPC
  Contract duration: 22 months
  Employer: Maron Petrochemical
  Location: in gas and liquefied gas plant 700 and 800 located in Khuzestan province, it is the area of ​​southern oil-rich areas.
Share
  •  
  •  
  •  
  •  
Contact Us
comments
 
Reply to:
your title *
comment *

برچسب ها
 
#turbocompressor #EPC
مطالب مرتبط
 
replacement of gas pipeline network with Maron as additional EPC activities
Full implementation of landscaping and construction of sandy car parking of Foley barracks Abad Ahvaz
Tamin Package B on-off Valves 18 to 34 inch valves
Completion of Gore crude oil storage tanks by EPC method, strategic tanks construction plan Crude oil