mahan sanat
mahan sanat
  • About
    • History
    • Representations obtained
    • Strategy
  • Projects
    • Surface Projects
    • Underground Projects
    • Operational Bases
    • Projects on Map
  • Certificates
    • Company Certificates
  • Communication
    • Contact us
    • Company News
منوی اصلی

  • History
  • Representations obtained
  • Strategy

  • Surface Projects
  • Underground Projects
  • Operational Bases
  • Projects on Map

  • Company Certificates

  • Contact us
  • Company News
  • Login
  • Sign up

   
English Persian
 
 
Return to list 
Current Surface Projects

Completion of Gore crude oil storage tanks by EPC method, strategic tanks construction plan Crude oil

purchase of goods and equipment and carrying out construction and installation works for the completion and construction and operation of 2 concrete tanks of 1,000,000 barrels and 4 tanks of 500,000 barrels along with ancillary facilities with capacity 4,000,000 barrels

  Contract Type: EPC
  Contract duration: 12 months
  Employer: oil development engineering
  Location: , Bushehr province - Gnaveh city, Goreh village (near the main oil transfer house of Goreh and 35 km from Gnaveh city
Share
  •  
  •  
  •  
  •  
Contact Us
comments
 
Reply to:
your title *
comment *

برچسب ها
 
#Makharan EPC
مطالب مرتبط
 
replacement of gas pipeline network with Maron as additional EPC activities
Full implementation of landscaping and construction of sandy car parking of Foley barracks Abad Ahvaz
Tamin Package B on-off Valves 18 to 34 inch valves
adding two turbo compressors in the gas and liquefied gas factory 700 and 800
Home  |  About Us  |  Contact Us  |  Sitemap

All rights of this site belong to Mahan Sanat Arya®